Planning Application DC/18/2395/FUL - Sheldon, 2 Stoney Lane, Barrow (Report No: DEV/SE/19/025)

Report No: DEV/SE/19/025

 

Planning Application - (i) 1no. dwelling with detached garages for new and existing dwellings (ii) Creation of vehicular access (Previous application DC/16/0001/FUL)

Minutes:

Planning Application - (i) 1no. dwelling with detached garages for new and existing dwellings (ii) Creation of vehicular access (Previous application DC/16/0001/FUL)

 

This application was referred to the Development Control Committee following consideration by the Delegation Panel.  The item was presented to the Panel due to the Parish Council having objected to the proposed development and Councillor Ian Houlder (Ward Member: Barrow) having raised concerns.

 

Officers were recommending that the application be approved, subject to conditions as set out in Paragraph 28 of Report No DEV/SE/19/025.

 

Within her presentation to the Committee the Senior Planning Officer made reference to the planning history of the site.  Members were also advised of a related application where development had commenced according to the applicant.  Officers were in the process of assessing the site in question but reminded the Committee that it was not relevant to the proposal they were considering.

 

Councillor Ian Houlder (Ward Member: Barrow) addressed the meeting on behalf of Barrow Parish Council who had been unable to attend.  He outlined their comments/concerns in relation to the application.

 

Councillor David Nettleton moved that the application be approved, as per the Officer recommendation.  This was duly seconded by Councillor Robert Everitt.

 

Upon being put to the vote and with the vote being unanimous, it was resolved that

 

Decision

 

Planning permission be GRANTED subject to the following conditions:

 1       The development hereby permitted shall be begun not later than 3 years from the date of this permission.

 2       The development hereby permitted shall not be carried out except in complete accordance with the details shown on the approved plans and documents.

 3       No development above slab level shall take place until samples of the facing and roofing shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details.

 4       The new vehicular access shall be laid out and completed in all respects in accordance with Drawing No. CS-002; and with an entrance width of 11metres at the boundary of the carriageway and made available for use prior to occupation. Thereafter the access shall be retained in the specified form.

 5       The gradient of the vehicular access shall not be steeper than 1 in 20 for the first 5metres measured from the nearside edge of the adjacent metalled carriageway.

 6       The access driveway shall be constructed at a gradient not steeper than 1 in 8.

 7       No development above ground shall take place until details have been submitted to and approved in writing by the Local Planning Authority showing the means to prevent the discharge of surface water from the development onto the highway. The approved scheme shall be carried out in its entirety before the access is first used and shall be retained thereafter in its approved form.

 8       Prior to first use of the development hereby permitted, the area(s) within the site shown on drawing No. CS-002 for the purpose of loading, unloading, manoeuvring and parking of vehicles has been provided.  Thereafter the area(s) shall be retained and used for no other purpose.

 9       Before the access is first used, the visibility splay in the north westerly direction shall be provided as shown on Drawing No. CS-002 with an X dimension of 2.4m and a Y dimension of 43m and thereafter retained in the specified form. Notwithstanding the provisions of Part 2 Class A of the Town & Country Planning (General Permitted Development) Order 2015 (or any Order revoking and re-enacting that Order with or without modification) no obstruction over 0.6 metres high shall be erected, constructed, planted or permitted to grow within the areas of the visibility splays.

10      No development above ground level shall take place until a scheme of soft landscaping for the site drawn to a scale of not less than 1:200, has been submitted to and approved in writing by the Local Planning Authority. The scheme shall include accurate indications of the position, species, girth, canopy spread and height of all existing trees and hedgerows on and adjacent to the site and details of any to be retained, together with measures for their protection during the course of development. Any retained trees removed, dying or becoming seriously damaged or diseased within five years of commencement shall be replaced within the first available planting season thereafter with planting of similar size and species unless the Local Planning Authority gives written consent for any variation. The works shall be completed in accordance with the approved plans and in accordance with a timetable to be agreed with the Local Planning Authority.

11      The dwelling(s) hereby approved shall not be occupied until the optional requirement for water consumption (110 litres use per person per day) in part G of the Building Regulations has been complied with and evidence of compliance has been obtained.

12      Prior to first occupation, all dwellings with off street parking shall be provided with an operational electric vehicle charge point at reasonably and practicably accessible locations, with an electric supply to the charge point capable of providing a 7kW charge. 

13      Demolition or construction works shall not take place outside 0800 hours to 1800 hours Mondays to Fridays and 0830 hours to 1300 hours on Saturdays and at no time on Sundays, public holidays or bank holidays.

 

(On conclusion of this item, and Part A of the agenda, the Chairman permitted an interval before proceeding with Part B of the agenda at 1.30pm.  During the interval Councillor Peter Stevens joined the meeting.)