Agenda item - Planning Application DC/19/1623/FUL - 17-18 Cornhill, Bury St Edmunds (Report No: DEV/WS/20/037)

Agenda item

Planning Application DC/19/1623/FUL - 17-18 Cornhill, Bury St Edmunds (Report No: DEV/WS/20/037)

Report No: DEV/WS/20/037

 

Planning Application - (i) Redevelopment of old Post Office site with retention of historic facade (ii) 12 no. flats (iii) 2 no. commercial units at ground floor and (iv) enlargement and repaving of public realm/footpath

Minutes:

(Councillor Susan Glossop declared a non-pecuniary interest in this item in view of being the relevant Portfolio Houlder under which the application in question fell.  She stated that she would not take part in the item and would abstain from the voting thereon.)

 

Planning Application - (i) Redevelopment of old Post Office site with retention of historic facade (ii) 12 no. flats (iii) 2 no. commercial units at ground floor and (iv) enlargement and repaving of public realm/footpath

 

This application was originally referred to the Development Control Committee on 6 November 2020 as West Suffolk Council was the applicant.

 

At the November meeting Members resolved to approve the application subject to a S106 Agreement and conditions.

 

The Senior Planning Officer advised that a decision had not yet been issued as the S106 had only earlier that month been agreed.

 

Whilst the material planning considerations already considered by the Committee and as set out in the attached Working Paper remained unchanged, during this time the project had advanced to detailed design stage and some minor, but material amendments had been made. 

 

Accordingly, the application was returned to the Committee for determination of the whole scheme.

 

Officers were recommending that the application be approved subject to conditions, as set out in Paragraph 26 of Report No DEV/WS/20/037.

 

During her presentation to the meeting the Senior Planning Officer drew attention to the late papers which had been circulated following publication of the agenda.

 

Members were also advised of two typographical errors:

·         Page 82 – the receipt date was 8 July 2020 (not June)

·         Working Paper 1 – the consultation undertaken was for 7 days

 

Councillor Ian Houlder proposed that the application be approved as per the Officer recommendation.  This was duly seconded by Councillor Jim Thorndyke.

 

Upon being put to the vote and with 15 voting for the motion and 1 abstention, it was resolved that

 

Decision

 

Planning permission be GRANTED subject to the following conditions:

 

 1       The development hereby permitted shall be begun not later than 3 years from the date of this permission.

 2       The development hereby permitted shall not be carried out except in complete accordance with the details shown on the approved plans and documents.

 3       No development shall take place on site until the implementation of a programme of archaeological work has been secured, in accordance with a Written Scheme of Investigation which has been submitted to  and approved in writing by the Local Planning Authority.  The scheme of investigation shall include an assessment of significance and research questions; and: 

          a.  The programme and methodology of site investigation and recording.

          b.  The programme for post investigation assessment.

          c.  Provision to be made for analysis of the site investigation and recording.

          d.  Provision to be made for publication and dissemination of the analysis and records of the site investigation.

          e.  Provision to be made for archive deposition of the analysis and records of the site investigation.

          f.  Nomination of a competent person or persons/organisation to undertake the works set out within the Written Scheme of Investigation.

          g. Timetable for the site investigation to be completed prior to development, or in such other phased arrangement, as agreed and approved in writing by the Local Planning Authority.

 4       No building shall be occupied or otherwise used until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the Written Scheme of Investigation approved under Condition 3 and the provision made for analysis, publication and dissemination of results and archive deposition has been secured.

 5       All HGV and construction traffic movements to and from the site over the duration of the construction period shall be subject to a Construction and Deliveries Management Plan which shall be submitted to the planning authority for approval a minimum of 28 days before any deliveries of materials commence.

          No HGV movements shall be permitted to and from the site other than in accordance with the routes defined in the Plan.

          The site operator shall maintain a register of complaints and record of actions taken to deal with such complaints at the site office as specified in the Plan throughout the period of occupation of the site.

 6       Notwithstanding the submitted details of the existing loading bay adjacent to the development on St Andrews Street South details of the bay shall be submitted to and approved in writing by the Local Planning Authority before first occupation. The approved loading bay shall be laid out and constructed in its entirety prior to first occupation. Thereafter the bay shall be retained in its approved form.

 7       Notwithstanding the submitted details of drainage and surface materials on adopted highway, no development above ground excluding demolition shall take place until details have been submitted to and approved in writing by the Local Planning Authority showing the means of surface water and surface treatment provision. The approved scheme shall be carried out in its entirety prior to fist occupation and shall be retained thereafter in its approved form.

 8       No above ground development excluding demolition shall take place until details of the provision to be made for parking for cycles to meet the current Suffolk Parking Guidance have been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be carried out in its entirety before the development is brought into use and shall be retained thereafter and used for no other purpose.

 9       One car parking permit per dwelling hereby approved shall be made available from first occupation in West Suffolk Council owned/run car parks within Bury St Edmunds and shall be provided thereafter unless agreed otherwise.

10      No development above ground level excluding demolition shall take place until details in respect of the following have been submitted to and approved in writing by the Local Planning Authority. 

          i)       Samples of external materials and finishes

          ii)       details of the connection between the new building and the historic section of the adjoining building (W H Smith)

          The works shall be carried out in full accordance with the approved details unless otherwise subsequently approved in writing by the Local Planning Authority.

11      No works involving new/replacement windows shall take place until elevation(s) to a scale of not less than 1:10 and horizontal and vertical cross-section drawings to a scale of 1:2 fully detailing the new/ replacement windows to be used (including details of glazing bars, sills, heads and methods of opening and glazing) have been submitted to and approved in writing by the Local Planning Authority. Unless otherwise approved in writing by the Local Planning Authority all glazing shall be face puttied. The works shall be carried out in complete accordance with the approved details.

12      No hard-standing areas to be constructed until the works have been carried out in accordance with the surface water strategy by Pick Everard ref. MC/TJH/180128/17-2/R001 - Issue Number 02 (dated August 2019)  unless otherwise agreed in writing by the Local Planning Authority.

13      Prior to any below ground construction (excluding any works necessary to support existing structures including the basement, neighbouring properties and the retained façade), an investigation in to the presence of any underground features associated with potential mining in the area shall be submitted to, and approved in writing by, the Local Planning Authority. Any land instability encountered by the investigation shall be mitigated for within the design of the structure.

14      Prior to commencement of development, including any works of demolition, a Construction Method Statement shall be submitted to, and approved in writing by, the Local Planning Authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide for:

          i)       The parking of vehicles of site operatives and visitors

          ii)       Loading and unloading of plant and materials

          iii)      Site set-up including arrangements for the storage of plant and materials used in constructing the development and the provision of temporary offices, plant and machinery

          iv)      The erection and maintenance of security hoarding including external safety and information signage, interpretation boards, decorative displays and facilities for public viewing, where appropriate

          v)      Wheel washing facilities

          vi)      Measures to control the emission of dust and dirt during construction

          vii)     A scheme for recycling/disposing of waste resulting from demolition and construction works

          viii)    Hours of construction operations including times for deliveries and the removal of excavated materials and waste

          ix)      Noise method statements and noise levels for each construction activity including piling and excavation operations

          x)      Access and protection measures around the construction site for pedestrians, cyclists and other road users including arrangements for diversions during the construction period and for the provision of associated directional signage relating thereto.

          xi)      Mechanical road sweepers

15      Demolition or construction works shall not take place outside 08:00 hours to 18:00 hours Mondays to Fridays and 08:00 hours to 13:00 hours on Saturdays and at no time on Sundays, public holidays or bank holidays unless otherwise previously agreed in writing with the Local Planning Authority.

16      The development shall be implemented in accordance with the recommendations of the Acoustic Design Report by aja Adrian james acoustics limited ref. 11899 Report 2 (dated November 2018) to achieve the following Internal noise levels to the residential units:

          -  ¡Ü 35dB LAeq,(16hr) daytime (Living rooms, Dining and Bedrooms)

          -  ¡Ü 30dB LAeq,(8hr) night-time (Bedrooms only)

          -  ¡Ü 45dB LAmax(fast) night-time (Bedrooms only) and noise from plant and services including ventilation systems must not exceed the above criteria.

17      Prior to occupation of the hereby approved commercial units a delivery management plan will be submitted to and approved in writing by the Local Planning Authority. The plan shall include, times of delivery, location and access points, types of vehicles to be used. Deliveries shall be carried out in accordance with the approved plan thereafter.

18      All ecological measures and/or works shall be carried out in accordance with the details contained in ECOLOGICAL IMPACT ASSESSMENT (June 2018) as already submitted with the planning application and agreed in principle with the Local Planning Authority prior to determination.

19      The dwelling(s) hereby approved shall not be occupied until the optional requirement for water consumption (110 litres use per person per day) in part G of the Building Regulations has been complied with and evidence of compliance has been obtained.